top of page

KIRKLEES COLLEGE

A new multi-disciplined engineering facility.

​

ASG Fabrications scope of works:

​

To supply and install the architectural metalwork package; working with the client`s architects and designers to create a working solution from the clients conceptual design brief.

 

Design, supply and installation of architectural metalwork comprising;

​

  • Mild steel feature balustrade with stainless steel wire infills to a high level link corridor, feature access stairs, escape stairs and workshop access stairs

  • Mild steel galvanised external spiral staircase and balustrade from first floor to the courtyard.

ASG Fabrications' Contribution to Kirklees College Engineering Facility

The Statistics

Client Name

PDR Construction Limited

​

Location

St Andrews Road, Huddersfield

​

Construction Costs

£69.200.00

​

Size of project

54,670 sqft

Project Overview: Enhancing Educational Infrastructure
Client Collaboration: Working with PDR Construction Limited
bottom of page